Two of the most demanding construction verticals — one shared platform. Smartapp is built for the commissioning rigour of hyperscale data centers and the infection control precision of live healthcare facilities.

// data_center_requirements
Hyperscale & enterprise data centers
Commissioning docs RF offline Access control Chain of custody Punch & Cx
// healthcare_requirements
Hospital & clinical facility construction
ICRA workflows Barrier inspections Live facility zones Joint Commission NFPA compliance
Quick answer Data center Commissioning DC offline Healthcare ICRA workflows HC compliance Comparison FAQ
// quick_answer

Smartapp is used by large general contractors on data center and healthcare construction projects because these verticals require capabilities most platforms can't provide: full offline operation in RF-shielded server rooms and restricted clinical zones; configurable commissioning checklists tied directly to drawing locations; ICRA (Infection Control Risk Assessment) permit workflows for construction in live healthcare facilities; and a complete chain-of-custody audit trail from initial inspection through final commissioning sign-off. Smartapp's no-code AppStudio allows GCs to configure these vertical-specific workflows without IT resources.

Data center construction

Built for the precision
hyperscale demands

Hyperscale data center construction is among the most technically rigorous work in the built environment. Schedule compression is extreme, commissioning documentation requirements are contractual, and connectivity is often impossible inside RF-shielded environments. Smartapp is the only construction management platform that handles all three natively.

📡
Full offline in RF-shielded areas

Server rooms, switch rooms, and UPS halls are RF-shielded by design. Smartapp FIELD™ operates completely without signal — drawings, commissioning checklists, and RFIs work identically inside and outside the shield.

FULLY OFFLINE
Commissioning checklist workflows

Pre-functional testing, functional testing, and integrated systems testing checklists configured in AppStudio and tied to drawing locations. Results captured offline, compiled automatically into Cx documentation packages.

CX DOCUMENTATION
🔐
Jobsite ACCESS hardware

Smartapp's integrated access control hardware manages credentialed entry to secure data center zones — tracking who entered which area and when, feeding a full access log into the project audit trail.

HARDWARE INTEGRATED
📋
Chain-of-custody audit trail

Every inspection, test result, drawing access, and sign-off is recorded with timestamp and user identity. The complete commissioning record — from initial walk to final handover — is preserved and exportable.

TAMPER-PROOF LOG
MEP coordination at speed

Data center MEP scope is dense and sequenced tightly. Smartapp's RFI workflow — submitted from drawing with photo and markup — cuts average response time by 60%, keeping mechanical, electrical, and plumbing trades moving.

60% FASTER RFIs
🗂️
Structured cabling & rack documentation

Configurable AppStudio forms capture structured cabling test results, rack installation records, and labelling verification — all pinned to the relevant drawing location and tied to the equipment asset register.

APPSTUDIO CONFIGURED
Commissioning documentation

From pre-functional testing
to final handover

Smartapp tracks the complete commissioning lifecycle — every phase documented on-device, offline inside RF-shielded areas, compiled automatically into exportable Cx packages.

// commissioning_lifecycle · data_center · smartapp_field
01
Pre-functional testing
Visual inspections, equipment checks, and installation verification checklists — all configured in AppStudio and linked to drawing locations.
OFFLINE CAPABLE
02
Functional performance testing
Equipment performance results captured on-device inside RF-shielded rooms. Pass/fail status, readings, and photos attached to each test item.
RF-SHIELDED OFFLINE
03
Integrated systems testing
Cross-system test sequences — power, cooling, fire suppression — documented with multi-party sign-off captured digitally on the same device.
MULTI-PARTY SIGN-OFF
04
Punchlist & deficiency resolution
Cx punchlist items raised from drawing locations, assigned to responsible parties, tracked to close. Full status visible in ORG Central.
DRAWING-LINKED
05
Handover documentation package
Smartapp automatically compiles all test records, sign-offs, and inspection results into a complete, exportable commissioning documentation package.
AUTO-COMPILED

"Commissioning documentation for a hyperscale data center used to take weeks to compile after the fact. With Smartapp, it builds itself as we go — every test result captured on-device, pinned to the drawing, ready to export."

— Project Director, Skanska
Offline in shielded environments

RF shielding blocks signal.
Not Smartapp.

Electromagnetic compatibility (EMC) requirements in server halls and switch rooms eliminate cellular and Wi-Fi. Smartapp FIELD™ pre-syncs everything the field crew needs before they enter — and queues everything they submit for automatic upload when they exit.

100%Feature availability inside RF-shielded zones
0Manual steps required on reconnect — auto-sync
AutoDrawing revision sync before each shift
iOS
+Droid
Full offline parity on both platforms

The offline architecture is local-first — not a cache layer on a cloud platform. Every drawing, checklist, and form the crew needs is stored on the device in its latest approved version before they enter the RF zone. Daily reports, Cx test results, RFIs, and safety observations are queued locally with full data integrity and synced automatically the moment the device exits the shielded area.

Healthcare construction

Construction in a live hospital
demands more than a Gantt chart

Healthcare facility construction happens in one of the most regulated, highest-stakes environments in construction. Patient safety, infection control, and regulatory compliance are non-negotiable — and they require construction management workflows that most platforms weren't built to handle. Smartapp was.

🛡️
ICRA permit workflows

Infection Control Risk Assessment permits configured in AppStudio — required approvals before any construction activity near patient areas, with digital signatures from infection control officers.

JOINT COMMISSION READY
🚧
Barrier inspection management

Daily barrier inspection checklists — dust barriers, negative pressure verification, HEPA filtration status — completed offline in restricted areas and compiled into compliance records automatically.

DAILY COMPLIANCE LOG
🏥
Phased construction zone management

Manage multiple construction zones with different access restrictions, infection control levels, and activity windows — all visible in a single project view showing live zone status and barrier integrity.

LIVE FACILITY AWARE
📵
Offline in wireless-restricted areas

Clinical areas restrict wireless devices. Smartapp FIELD™ works completely offline — checklists, daily reports, RFIs, and safety forms in restricted zones, syncing when the crew exits.

FULLY OFFLINE
📜
Regulatory compliance documentation

Configurable checklists for Joint Commission (TJC), NFPA 101 Life Safety, and state health department requirements. Compliance records compiled automatically — no manual aggregation before inspections.

TJC · NFPA · AHJ
🔔
Patient impact coordination

Construction activity windows — noise, vibration, utility shutdowns — scheduled and communicated through Smartapp's notification system, coordinating with clinical operations teams before impact begins.

CLINICAL COORDINATION
ICRA workflow

Every construction activity near
patients — tracked and permitted

Smartapp's ICRA workflow ensures no construction activity begins in or adjacent to patient areas without the correct permit, correct approvals, and correct precautions in place — and creates a complete, auditable record of every permit issued.

// icra_permit_workflow · smartapp_appstudio · live_healthcare_facility
1
Activity classified and risk-assessed
Construction crew completes ICRA classification form in Smartapp — project type, location, proximity to patient areas, dust-generating activities. Risk class automatically calculated (Class I–IV per APIC guidelines) and routes to appropriate approval chain.
AUTO-CLASSIFICATION · APIC GUIDELINES
2
Required precautions identified and assigned
Based on risk class and activity type, Smartapp automatically generates the required precaution checklist — barrier specifications, HEPA requirements, negative pressure verification, signage. Assigned to the responsible GC supervisor.
RULE-BASED PRECAUTION ASSIGNMENT
3
Infection control officer reviews and approves
Permit routed digitally to the hospital's infection control officer for review and sign-off. No construction activity begins until approval is received and logged. Approval timestamps are tamper-proof.
DIGITAL SIGN-OFF · FULL AUDIT TRAIL
4
Daily barrier inspections completed and logged
Every day the permit is active, the construction supervisor completes a barrier integrity inspection checklist in Smartapp FIELD™ — offline capable for restricted clinical zones. Results compiled into a daily compliance log.
DAILY COMPLIANCE · OFFLINE CAPABLE
5
Permit closed and documentation compiled
When work is complete, the permit is closed with a final inspection sign-off. Smartapp automatically compiles the full permit record — risk assessment, approvals, daily inspection logs, and closure — into an exportable compliance document ready for Joint Commission review.
AUTO-COMPILED COMPLIANCE RECORD

"Joint Commission survey used to mean scrambling to compile paper ICRA records from three different filing systems. With Smartapp, every permit, every daily inspection, every sign-off is already compiled and ready to export."

— VP of Construction, major US hospital system GC
Regulatory compliance

Every inspection body.
One platform.

Healthcare construction compliance spans multiple regulatory bodies with different requirements and inspection cadences. Smartapp's configurable checklists cover all of them — from Joint Commission to state-specific AHJ requirements.

83%Faster worker onboarding including ICRA training verification
91%Faster meeting minutes and permit documentation
100%FIELD features available offline in restricted zones
0Manual compilation steps before regulatory inspections
Compliance area Requirement Smartapp capability
Infection control
ICRA permitsRequired before any Class II–IV activityConfigurable permit workflow with digital sign-off
Daily barrier inspectionsRequired per APIC / AHJ requirementsDaily checklist with automatic compliance log
Negative pressure verificationRequired for Class III–IV areasInspection checklist item with reading capture
HEPA filtration confirmationRequired for dust-generating work near patientsPhoto-documented checklist confirmation
Life safety
NFPA 101 Life Safety CodeInterim Life Safety Measures (ILSM) requiredILSM checklist workflow in AppStudio
Means of egressDaily verification during constructionEgress inspection checklist with photo log
Fire watch protocolsRequired during hot workHot work permit with time-stamped fire watch log
Joint Commission (TJC)
EC.02.06.05 (Construction risk)Documented pre-construction risk assessmentPCRA form configured in AppStudio
EC.02.05.01 (Utility management)Utility shutdown documentationUtility isolation permit workflow
Survey-ready documentationAll records retrievable on demandSingle-click export of all compliance records
Platform comparison

Smartapp vs the alternatives
for these two verticals

Most construction management platforms are designed for standard commercial construction. Here's how Smartapp compares on the capabilities that specifically matter for data center and healthcare projects.

Capability Smartapp Procore Autodesk CC
Data center specific
Full offline in RF-shielded areas✓ FULLY OFFLINELimitedLimited
Cx checklist tied to drawing location✓ NativeManual processManual process
Integrated access control hardware✓ Jobsite ACCESSNot availableNot available
Auto-compiled Cx documentation✓ AutomaticManual compilationManual compilation
No-code Cx workflow configuration✓ AppStudioDev resources neededDev resources needed
Healthcare specific
ICRA permit workflow✓ ConfigurableNot nativeNot native
Daily barrier inspection checklists✓ Automated logManualManual
Offline in wireless-restricted areas✓ FULLY OFFLINELimitedLimited
Phased zone management✓ NativeWorkaround neededWorkaround needed
Survey-ready export (TJC)✓ Single-clickManual aggregationManual aggregation
From the field

"Data center commissioning is a paperwork marathon. Smartapp turned it into something our field crews actually do in real time — every test result captured on-device inside the shielded room, every sign-off digital, everything compiled without anyone chasing PDFs."

— Commissioning Manager, Skanska Data Center Division
From the field

"Infection control compliance in a live hospital used to mean a dedicated person whose full-time job was managing paper permits and chasing signatures. Smartapp automated the entire workflow. Our infection control officer reviews and approves from her phone."

— Project Manager, healthcare facility GC
FAQ

Common questions

Can Smartapp's commissioning checklists be customised for specific data center equipment?

Yes. Smartapp's no-code AppStudio allows GCs to build commissioning checklists for any equipment type — UPS systems, precision cooling, generator sets, power distribution units, structured cabling, fire suppression — without IT or development resources. Checklists can include numeric reading fields, pass/fail items, photo capture, and multi-party sign-off. Once built, checklists are tied to specific drawing locations so the field team always accesses the right checklist for the right piece of equipment.

How does Smartapp manage construction zones in a hospital with patient areas immediately adjacent?

Smartapp's phased zone management allows GCs to define construction zones on the project drawings, assign infection control risk classes to each zone, and track barrier integrity and ICRA permit status per zone in real time. Zone status is visible to both the construction team and the hospital's facilities and infection control teams. Activity windows — noise, vibration, utility impacts — are scheduled within the platform and communicated to clinical operations before work begins. Access to each zone is controlled through Smartapp's permit workflow, which requires the correct approvals before any crew enters a sensitive area.

What happens to commissioning records if a device is lost or damaged before syncing?

Smartapp's local-first architecture stores all offline data in encrypted local storage with regular local backups. If a device is damaged, the most recent backup can be restored to a replacement device. For extended commissioning sessions inside RF-shielded areas, Smartapp recommends establishing a daily sync protocol — exiting the shielded zone briefly at the end of each shift to upload. In addition, for critical Cx documentation, Smartapp supports a connected coordinator device outside the shield who receives synced submissions in real time as team members exit.

Can Joint Commission documentation be exported in a specific format for survey preparation?

Yes. Smartapp exports compliance documentation packages in PDF format, organised by permit number, date range, zone, or compliance category. ICRA permits export with the complete record: risk assessment form, approval signatures and timestamps, daily inspection logs, and closure documentation. The export is formatted for direct submission to Joint Commission surveyors and state health department inspectors. Custom export templates can be configured in AppStudio to match specific surveyor preferences.

Does Smartapp integrate with hospital facilities management systems (CAFM/CMMS)?

Yes, via Smartapp's open REST API and the SAP PM module integration (for hospitals running SAP). During the construction phase, Smartapp captures equipment as-installed data — specifications, serial numbers, installation dates, test results — that can be transferred directly to the hospital's CAFM or CMMS at project handover. This eliminates the manual data entry that typically follows construction completion and ensures the facilities management system starts with accurate, verified as-built equipment data.

How does Smartapp handle multi-phase data center projects where new halls are commissioned while others are still under construction?

Smartapp's ORG Central portfolio view handles multi-phase data center projects natively — each hall or phase is managed as a distinct project within the same portfolio, with its own commissioning workflow, access control configuration, and documentation package. Executives can see the commissioning status of all phases simultaneously, while field teams work within their specific phase. Cross-phase RFIs and coordination items are managed through Smartapp's standard workflow with phase-specific routing.

See Smartapp on your vertical

Request a demo tailored to your data center or healthcare project types — commissioning workflows, ICRA configuration, or offline capability in your specific environment.